Inari Piotr Ciechociński

Inari Piotr Ciechociński

Call: +48 519 183 134 e-mail  This email address is being protected from spambots. You need JavaScript enabled to view it.
N Models

Precisely reconstructed model of the bridge in scale 1:43.5 based on the original documentation of the bridge.

The model is made of photo-etched metal plates joined by precision soldering.

In the late 40s of XIX century, the decision was taken to build two new railway bridges: on the river Vistula in Tczew and on the river Nogat in Malbork. The construction works started in the spring of 1888. The bridge in Tczew had 6 spans (143.5 yd each), and the one in Malbork had 2 main spans (107.1 yd each). At first sight, the spans were similar, so was the construction.

Precision bridge model at the scale of 1:160, based on the original bridge documentation.

Accurate reconstruction of bridge model at the scale of 1:160. Based on the documentation and consulted with the bridge designer.

Accurate reconstruction of bridge at the scale of 1:160. Based on the documentation and consulted with the bridge designer.

Cardboard model of one span of the reinforced concrete road bridge, made at the scale of 1:160. The original bridge was built in the interwar period. At that time, it was the largest construction of such type in Poland. The entire passage consisted of four spans.

The model was presented for the first time at the Cologne Fare on 22-25.11.2012.

Page 1 of 2

Our partners:

Omak   MBR   

You are here: HOME Models Bridge Models N Models

Tel: (+48) 519183134
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Ta strona korzysta z plików cookies w celach statystycznych oraz w celu dostosowania naszych serwisów do indywidualnych potrzeb użytkowników.Czytaj wiecej o plikach cookie i naszej polityce prywatności. Zamknij