Inari Piotr Ciechociński

Inari Piotr Ciechociński

Call: +48 519 183 134 e-mail  This email address is being protected from spambots. You need JavaScript enabled to view it.
TT Models

The bridge construction is based on the inventory documentation. It was included in the design study for renovation of the Skarżysko-Kamienna - Sandomierz railway line. The bridge on the river Przepaść, 125.3 mi.

The bridge construction is based on the design study for the renovation of the Skarżysko-Kamienna - Sandomierz railway line. The bridge on the river Opatówka, 142.7 mi.

Page 2 of 2

Our partners:

Omak   MBR   

You are here: HOME Models Bridge Models TT Models

Tel: (+48) 519183134
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Ta strona korzysta z plików cookies w celach statystycznych oraz w celu dostosowania naszych serwisów do indywidualnych potrzeb użytkowników.Czytaj wiecej o plikach cookie i naszej polityce prywatności. Zamknij